Light Switches and Light Buttons
A while back I made a case for getting new lights installed throughout the house as we were re-wiring the house and replacing the electrical panel as part of some renovations. We already had one LIFX bulb in the house and decided to buy their Colour Downlights and LED strips. We initially started with a…
-
21 Months later
It has been 21 months since I wrote the 36 Months post and despite the number of drafts I have slowly brewing, I’ve never gotten around to actually hitting the publish button on a third post. While this post is meant as a follow up to both previous posts with some quick updates, I’ve also…
-
What we’ve got
I took two days off work in the days immediately after the business Internet was provisioned and went through the rack. I rebuilt, reconfigured and rearranged things to make life easier. Let’s go through some of what we have in and around the rack. The rack and power The rack itself is an APC AR3100…
-
36 Months
Long before I was employed as a Linux Sysadmin it was my hobby. I’ve been employed as a Network Engineer, a Linux Sysadmin or a combination of the two (and a few other things) over the years. I’ve shared the pain of being on-call and spent more hours in data centres than I’d like to…